EAFLOW · SOLUTIONS · CROSS-INDUSTRY SOLUTION

Contractors, Assets and Interventions

Contractor clearance, the prerequisites for the intervention, the evidence of the work and the decision of whoever receives it, all held in one case file — through to a recorded outcome, formal acceptance or reasoned rejection, confirmed by the authorized owner or by the system of record for that milestone, whichever was agreed for the job. The handback of the asset to operations is recorded separately where it applies.

Category
Contractors, Assets and Interventions — cross-industry solution on the Operational Graph
When to use
Third-party work on an asset or facility: contractor clearance, prerequisites, execution with evidence, findings and a recorded outcome: formal acceptance or reasoned rejection
Users
Maintenance, operations, contract administration, health and safety, asset owners, and the contractor with scoped access to its own case file
Output
An intervention case file with current contractor clearance, prerequisites and work evidence, the disposition of each finding, and a recorded outcome — formal acceptance or reasoned rejection — with any required handback recorded separately
Implementation
Cross-industry solution with assisted implementation; runs alongside the existing EAM/CMMS, work-permit system and operational control
Does not replace
It does not replace the EAM/CMMS, the work-permit system or the operational control of the asset, and it does not issue the authorizations that allow work to begin: it coordinates the prerequisites, holds the evidence and records the outcome — formal acceptance or reasoned rejection — using outputs from those systems as inputs and evidence in the case file.

01 · The problem

The job is assigned and still waiting on a requirement nobody can see

Work on an asset rarely stalls for lack of goodwill. It stalls because a contractor certificate expired last week, because someone on the crew does not hold the qualification that type of work requires, because the asset was never released in the window agreed with operations, because a permit another system has to issue is still outstanding, or because no one designated who will accept the work once it is finished.

Several tools support the job, each handling one part well: a Microsoft Excel sheet with the document matrix for each contractor, Microsoft SharePoint folders holding the certificates, an EAM/CMMS with the work order and the asset history, and Power BI reporting on open jobs. What none of them shows is which requirement is holding the job up today, who has to clear it, and on what evidence the work was accepted.

The case file for the intervention does exist. It is simply split across the party that contracts the work, the party that operates the asset and the party that carries it out.

02 · The solution

From clearing the contractor to a recorded outcome for the intervention

Every intervention is managed in a single case file through an agreed sequence: clearing the contractor and checking that its documentation is current, preparing the job on a specific asset, pulling together the prerequisites and the permits issued by the systems that own them, carrying out the work with evidence, review by whoever receives it, and a recorded outcome: formal acceptance or reasoned rejection. The handback of the asset to operations is recorded separately where it applies.

What ties those steps together is already defined in the Operational Graph: every job hangs off the asset or facility it touches, the service that may be affected, the contract covering it, the documentation its work category calls for, and the owner who can accept it. BPMflow supports the case file day to day — cases, prerequisites, deadlines, scoped contractor participation and evidence — working from those same definitions rather than from a standalone diagram.

What counts as closure

  • Clearance is not acceptance. A cleared contractor may carry out the work; what it delivers still has to be reviewed and accepted by whoever receives it. Two separate decisions, with different owners at different moments.
  • Returning work for rework and rejecting it on stated grounds are different outcomes. A return leaves the job open, with the finding assigned to an owner and a re-check still pending. A rejection closes the case with its grounds on record. Neither one counts as acceptance.
  • A task the contractor marks as finished is not a closure. The receiving owner gives or refuses acceptance against the agreed evidence. The resulting milestone is then confirmed by that owner or recorded by the agreed system of record. Handback of the asset to operations remains a separate milestone: it can stay open even after the work has been accepted.

When the work alters the design, the procedure or the operating conditions of the facility, industrial change follows a path of its own: Oil & Gas Industrial MOC. Setting the contractor up as a supplier — registration, categories, contractual documentation and changes to the relationship — belongs to Supplier Onboarding and Changes.

03 · Capabilities

From the missing requirement to acceptance or rejection, in a single case file

Jobs sit in a single queue, with the asset, the contractor, the outstanding requirement, the agreed window and the receiving owner all in plain view. Within the authorized context, Max answers questions about the case file: which requirement is missing, what evidence is on record and who the next owner is.

  • Contractor clearance and document validity

    Gathers the documentation each work category and legal entity requires, and tracks expiry dates so a certificate does not lapse midway through a scheduled job.

  • Preparing the intervention on the asset

    Ties the job to the asset or facility, the window agreed with operations, the service that may be affected and the owners who need to be informed.

  • Prerequisites and prior authorizations

    Brings together what must be in place before work starts: workers holding the qualifications and authorizations the job requires, job-specific documentation, and the permits issued by the systems that own them, recorded as inputs to the case file.

  • Execution with attributable evidence

    Records who carried out the work, what was done, when, which parts or materials were declared as used, and which verifications were documented. The contractor takes part with scoped access to its own job.

  • Findings, return for rework and re-verification

    Every finding carries an owner, a deadline and a criterion for clearing it. Work returned for rework is checked again against that criterion before the finding is closed.

  • Recorded outcome and handback of the asset to operations

    Records the decision of the receiving owner — formal acceptance or reasoned rejection — any conditions left open and, where it applies, the handback of the asset to operations, with the case file retained for contract administration and for the next intervention.

04 · Roles

Who prepares the job, who clears the contractor, who performs it and who receives it

Maintenance planner

Prepares the intervention and coordinates it with operations.

What they see

Jobs by asset, contractor, agreed window and outstanding requirement, with whatever is still missing to start.

What they do

Builds the case file, agrees the window with operations and records that the prerequisites are in place so the job can move ahead; issuing the permit stays with the system that owns it.

Contract administration

Keeps each contractor’s clearance current.

What they see

Each contractor’s valid and soon-to-expire documentation, by work category, legal entity and contract.

What they do

Clears, restricts or suspends a contractor’s participation on the strength of its documentation and the terms of the contract.

Asset or area owner

Receives the work and decides whether to accept it.

What they see

The work performed, the evidence provided and the findings still open on the asset in their care.

What they do

Accepts, returns the work for rework, or rejects it on stated grounds, and confirms the handback of the asset to operations.

Contractor

Performs the work and supplies its evidence.

What they see

Its assigned jobs, the requirements it has to complete and the findings it has to clear, in its own case file.

What they do

Updates its documentation, documents the work and attaches evidence, and responds to the findings raised.

05 · Implementation

Start with one work type, without pausing the maintenance plan already running

Implementation starts from the work as it runs today: one intervention type and a limited group of contractors are enough to begin, with no architecture project up front.

1 · Agree on the outcome

Work types, requirements and who decides

Which interventions are in scope, what documentation each work category requires, which authorizations must be on record before work starts, and who decides — formal acceptance or reasoned rejection.

2 · Capture the operating context and connect sources

Assets, contracts, work orders and documentation

Takes the asset and the work order from the EAM/CMMS, the contract and the contractor categories from contract administration, and integrates with the organization’s authorized document repository when that is the source of record for certificates.

3 · Test the path and adopt it

Queue, acceptance and handback

The workflow is tested on interventions from the current period; requirements, deadlines and acceptance criteria are then refined based on the test results, and day-to-day operation stays with the client’s own team.

06 · Typical scenarios

What comes up between the work order and the handback of the asset

Several legal entities, assets spread across sites, contractors with documentation about to expire, and jobs that depend on an operating window: situations that come up regularly in maintenance plans and planned shutdowns.

  • Expired contractor certificate
  • Worker without the qualification the job requires
  • Asset unavailable in the agreed window
  • Authorization pending in the system that issues it
  • Intervention with an affected service
  • Work performed without sufficient evidence
  • Findings still open when the work is received
  • Returned for rework
  • Work rejected on stated grounds
  • Accepted with conditions still open
  • Asset handed back to operations
  • Emergency work under the authorized procedure, evidence completed afterwards

An intervention closes when the receiving owner has accepted the work or rejected it on stated grounds, there is evidence of what was done, and that outcome is confirmed by the same owner or recorded by the agreed system of record. Handback of the asset to operations is tracked as a milestone of its own. The practical way in is one specific work type and a limited group of contractors.

Contractors, Assets and Interventions is an EAFlow cross-industry solution on the Operational Graph, supported by BPMflow’s automation capabilities. The EAM/CMMS remains the system of record for the asset and the work order, the work-permit system remains responsible for issuing the permit, and operational control stays with its own systems: what they produce is recorded as input and evidence in the case file. When the work alters the design or the operating conditions of the facility, industrial change follows a path of its own.