- Category
- Contractors, Assets and Interventions — cross-industry solution on the Operational Graph
- When to use
- Third-party work on an asset or facility: contractor clearance, prerequisites, execution with evidence, findings and a recorded outcome: formal acceptance or reasoned rejection
- Users
- Maintenance, operations, contract administration, health and safety, asset owners, and the contractor with scoped access to its own case file
- Output
- An intervention case file with current contractor clearance, prerequisites and work evidence, the disposition of each finding, and a recorded outcome — formal acceptance or reasoned rejection — with any required handback recorded separately
- Implementation
- Cross-industry solution with assisted implementation; runs alongside the existing EAM/CMMS, work-permit system and operational control
- Does not replace
- It does not replace the EAM/CMMS, the work-permit system or the operational control of the asset, and it does not issue the authorizations that allow work to begin: it coordinates the prerequisites, holds the evidence and records the outcome — formal acceptance or reasoned rejection — using outputs from those systems as inputs and evidence in the case file.