EAFLOW · SOLUTIONS · INDUSTRY ACCELERATOR · REAL ESTATE

Property Handover and Aftersales

The walk-through of every unit, the items the buyer raises, the contractors who put them right and the warranty that keeps running afterwards, all held in one case file — from the pre-handover inspection through to sign-off by whoever is entitled to give it for that event.

Category
Property Handover and Aftersales — industry accelerator on the Operational Graph
When to use
The stretch that opens once a sold unit is ready to hand over: pre-handover inspection, the walk-through with the buyer, items with an owner and a turnaround, and the warranty requests that follow
Users
Handover and aftersales teams at the developer, together with the main contractor, technical inspection, the trades doing the repairs, the building manager, and the buyer with scoped access to their own unit
Output
A handover certificate carrying the buyer's decision — accept, accept with items outstanding, or decline to take possession — every item assessed with its owner, turnaround and proof, the sign-off recorded on closure, and the warranty status of each trade
Implementation
Industry accelerator with assisted implementation; runs alongside the commercial system, the construction system and the project document repository
Does not replace
It does not replace the commercial system, the construction system or the main contractor's own tools, it does not stand in for the contractual and legal steps of the sale, and it does not issue the technical judgment of whoever assesses an item: it holds the walk-through, the items raised and the warranty in one case file per unit, with an owner, a turnaround and proof, through to sign-off by whoever is entitled to give it for that event.

01 · The problem

The keys change hands once; the punch list comes back for months

The unit is finished and the buyer arrives to take possession. They walk the apartment with a printed sheet, note what they find — a door that catches, a leak under the kitchen sink, a missing fitting — and sign. From that moment the list scatters: part of it goes to the main contractor, part sits in a messaging thread with the finishing foreman, and part travels back to the sales agent, the only contact the buyer has a name for.

Follow-up runs on whatever is at hand: a Microsoft Excel workbook per building listing the items raised in each apartment, photographs on the handover coordinator’s phone, email to book the contractor’s visit, and a separate form for warranty requests. Each piece does its job, and none of them shows which item is still open today, who owns it, by when, and who signed it off.

The developer measures the project in units handed over; the buyer measures it by the one defect nobody has turned up to fix.

02 · The solution

From an item raised in the apartment to an outcome confirmed by whoever is entitled to give it

Every unit gets its own case file and an agreed sequence: pre-handover inspection, the walk-through with the buyer present, each item captured with its assessment and its owner, assignment to the contractor responsible, re-inspection of the completed work, and sign-off from whoever is entitled to give it for that item: the buyer for what they undertook to verify, the authorized owner or the designated system, or technical inspection. Once the unit is handed over, that same case file goes on taking warranty requests, showing the trade involved and the period still running.

Each handover is built on what the Operational Graph already holds as approved: the project, the phase and the building, the unit layout and its specification, the contractor behind each trade, the warranty running on each, and the buyer with their purchase agreement. BPMflow provides the workflow underneath — cases, assignment, due dates, authorizations and evidence — so a one-off defect and the same defect across twenty units of one layout can be read side by side.

What counts as closure

  • Taking possession with items outstanding is a handover, not a half-finished one. The unit is handed over from the recorded date and the case file stays open on each item, with its owner, its turnaround and the criterion for resolving it. Declining to take possession is a different outcome: the handover is set aside, with the reason on record and a new date to agree.
  • A repaired item is not yet a signed-off item. The contractor reports the work carried out; the item closes when the sign-off is recorded by the authorized owner or the designated system, as agreed for that event — the buyer for what they undertook to verify, or technical inspection where verification does not rest with them. It can also be settled as not covered, with the grounds recorded and communicated.
  • A missed date escalates the item; it does not close it. An item that reaches its turnaround without sign-off escalates to the agreed owner and its date is renegotiated with the reason on record: nothing counts as resolved because it expired or because nobody chased it. Each trade carries its own warranty period, and an item closed within it can be reopened if the problem returns.

Two handovers that do not stand in for each other

Project Handover to Operations covers a stretch that sounds similar and works differently. There the receiving side is an internal team about to run a service or an asset, and the evidence is acceptance conditions, support owners and current documentation. Here the receiving side is the buyer, the object is their apartment under a purchase agreement, and the evidence is the signed certificate, the signed-off item and the warranty on each trade. A developer doing both needs both paths, not one bent to serve the other.

The commercial work that precedes it — channels, qualification, viewings and follow-up — is Real Estate Sales Operations, and this path picks up where that one leaves off. Where a third party works on the building itself, that job keeps its own clearance and acceptance in Contractors, Assets and Interventions.

03 · Capabilities

The certificate, the open items and the warranty live in one file per unit

Units sit in a queue by phase and by building, with the handover date, the open items and their turnaround dates in plain view. Max answers about the case file within the authorized context: it explains which item is still open, shows the evidence on record and proposes the next owner.

  • Pre-handover inspection before the buyer is invited

    Records the internal walk-through that precedes the appointment: which trades were inspected, what was flagged before the buyer was called in, and what has to be put right for the unit to be ready to hand over.

  • Walk-through with the buyer and a signed handover certificate

    Captures each item in the apartment, with a photograph and the room it belongs to, and records the buyer’s decision: accept, accept with items outstanding, or decline to take possession, with the signature the certificate calls for.

  • Assessment and ownership of every item raised

    Separates finishes, building services, fittings, damage from use after handover, and common areas: each type sets who puts it right, which warranty applies and what turnaround is committed. An item can also be assessed as not covered, with the grounds recorded and communicated.

  • Contractor assignment and proof of the work done

    Routes the fix to the contractor or trade responsible, with the unit, the room and the agreed access, and keeps the proof of what was carried out: the work performed, the person who performed it and the date.

  • Re-inspection and recorded sign-off

    Re-checks the completed work before anything is treated as closed, and stores the sign-off from whoever is entitled to give it. Where an item comes back, the case file shows it against the same unit and the same trade rather than opening as a fresh complaint with no history.

  • Warranty by trade and repeat defects

    Keeps the warranty period for each trade and the channel through which an owner raises a request after handover. Anything that recurs across one unit layout stands out as a project-level pattern and reaches the people who set the specification for the next phase.

04 · Roles

The buyer takes part in the process rather than waiting at the end of it

The items owners raise, the visits they agree and the sign-offs they give sit inside the case file, not in a customer-service channel running beside it.

Handover coordinator

Prepares the unit and runs the walk-through.

What they see

The handover schedule by building, the pre-inspection status of each unit, and the open items with their owner and turnaround.

What they do

Books the buyer, completes the certificate, assesses each item with its owner, and tracks the dates committed.

Aftersales manager

Looks after the unit once it has been handed over.

What they see

Warranty requests by project, trade and age, alongside the evidence from the original handover and from earlier repairs.

What they do

Accepts the request or declines it with stated grounds, routes it to the right trade, and records the sign-off where verification does not rest with the owner.

Contractor or trade

Puts right what falls to them.

What they see

The items assigned to them with the unit, the room, the photograph on record and the access date agreed, in their own case file with scoped access.

What they do

Arranges the visit, carries out the repair, records what was done together with the proof, and returns the item for verification.

Buyer of the unit

Takes possession, raises items and signs them off.

What they see

The status of their own unit: what they raised, what was committed, by when, and which warranty is still running on each trade.

What they do

Walks the unit and raises the items, agrees the repair visits, and grants or withholds sign-off on what they undertook to verify.

05 · Implementation

One building and one handover date are enough to begin

Implementation starts from a specific handover already in the diary: the context of that phase, its unit schedule and its contractors is enough, with no prior architecture project.

1 · Agree on the outcome

Item types, owners and turnaround

Which items are in scope, how they are assessed, who puts each type right, what turnaround is committed, who may rule an item as not covered, and which sign-off closes each case.

2 · Bring in context and connect sources

Project, units, buyers and contractors

Draws the project, the phase, the building and the unit schedule from the construction system; the buyer and the purchase agreement from the commercial system; and integrates with the project document repository where that is the authorized source for drawings, specifications and certificates.

3 · Test the path and adopt it

Certificate, open items and handover of the workflow

The path is tested against the handovers of the building currently in progress; the team tunes assessments, turnaround and sign-off criteria; and day-to-day operation stays with the client team.

06 · Typical scenarios

What owners write down on the day they walk their apartment

Several buildings handing over at once, contractors whose construction contract has already closed, and warranties running to different periods by trade: familiar ground on a project in handover. The scenarios below are illustrative.

  • Finishing defect raised at the walk-through
  • Water ingress found after handover
  • Fittings missing from the unit handed over
  • Buyer who does not attend the booked appointment
  • Unit taken over with items still outstanding
  • Item that comes back at re-inspection
  • Item assessed as not covered
  • Contractor without agreed access to the unit
  • Item that belongs to a common area, not the unit
  • Warranty request raised after handover
  • The same defect repeating across one unit layout
  • Missed turnaround escalating to the aftersales manager
  • Closure confirmed by the owner’s sign-off

A handover is closed when the unit has been taken over with its certificate on record and every item carries the sign-off of whoever is entitled to give it for that event: the buyer for what they undertook to verify, or the authorized owner or designated system where it does not rest with them. Starting from one building and its first handovers is the practical way in.

Property Handover and Aftersales is an EAFlow industry accelerator on the Operational Graph, supported by the BPMflow automation capabilities. Real Estate Sales Operations covers the commercial work before it; Contractors, Assets and Interventions covers third-party work on the building. Project Handover to Operations answers a different question, with a different receiving side and different evidence. The contractual and legal steps of the sale keep their own owners and procedures.